Check the status of the timesheet, which will appear alongside the timesheet reference number in the main Timesheets view.
If the status is 'Approved', the timesheet should be 'un-approved' by selecting that option in the contextual action button, then 'un-submit' using the same action button. This will then allow to Timesheet to be corrected and re-submitted.